NOTICE OF THE PROPOSED ESKOM up to 5200 MW NUCLEAR POWER PLANT, THYSPUNT – KOUGA LOCAL MUNICIPALITY IN THE EASTERN CAPE PROVINCE / BANTAMSKLIP – OVERSTRAND LOCAL MUNICIPALITY IN THE WESTERN CAPE PROVINCE

Notice is given in terms of Regulation 41(2) of GNR 982 (as amended) published under section 24 and 24D of the National Environmental Management Act (No. 107 of 1998) (NEMA) (as amended) in respect of activities identified in terms of GNR 983, GNR 984 and GNR 985 (as amended)

DESCRIPTION AND LOCATION

Eskom Holdings SOC Limited (Eskom) proposes the establishment of a Nuclear Power Plant (NPP) generating up to 5200 MW, with associated infrastructure, at either Thyspunt in the Kouga Local Municipality of the Eastern Cape Province, or, Bantamsklip in the Overstrand Local Municipality of the Western Cape Province, which requires an Environmental Authorisation (EA) application.

FINAL SCOPING REPORT

The Final Scoping Report (FSR) was submitted to the Department of Forestry Fisheries and the Environment (DFFE) on 06 July 2026. The FSR is available for your information at the following venues:

 

Verified by MonsterInsights